WWTP Process Design Checklist

Project:
Date Project Sales Person

Project: Job No.

Address:

State: County Local

Engineer/Consultant Owner:

Contact: Contact:

Email: Email:

Phone:


 

Information Requested:

Date Needed By:


 

Influent/Parameters (Mg/l):


Is Inflow data assumed values?

Shall we use standard values?
   
   

Effluent/Parameters (Mg/l):

Discharge
Effluent data is:

Shall we use standard values?

   
 
mg/l as:

Instanteous Maximums


Plant Site:

Geotechnical Study:




Site Discharge


Is plant top at Grade?


100 Year Flood Elevation?


If the plant must be out of the ground by 2ft or more then a modular is not appropriate. USE a PT design

 

Project Engineer Signature Date