WWTP Process Design Checklist

Project:


Information Requested:

Prelim Plans
Process Design Report
Other
Date Needed By:
Bid Plans and Specs
Prelim Cost
Sample Bid Form
Proposal
Structural Specs
Process Specs
Attached NPDES Permit
Estimated
Equipment List
General Specs

Influent/Parameters (Mg/l):

GPD
Phosphorus
Forcemain Gravity
Actual Laboratory tested data?
Yes
No
MGD
Fats, Oils, Grease
Max GPM if Force Main
Is inflow data assumed values?
Yes
No
BOD
Infl. pipe size
Peak Flow Factor
Shall we use standard values?
Yes
No
TSS
Inf P
NH3-N
Inf. other

Effluent/Parameters (Mg/l):

BOD
Fecial Coliform
Discharge
Gravity
Pumped
Shall we use standard values?
Yes
No
TRC
Final Discharge Point
Monthly Avg
TSS
Phosphorus
Other
Yearly Avg
DO
Nitrogen
mg/l as:
NH3-N
TKN
TN
Daily Maximum
Instanteous Maximums
Yes
No

Plant Site:

Geotechnical Study:
Is Available
Is Not Available
No Investigation
None
Site Discharge
To stream
To drainfield
forcemain
Is plant top at Grade?
Yes
No
100 Year Flood Elevation?
Yes
No
Anti-Buoyancy measures will be needed
will NOT be needed

If the plant must be out of the ground by 2ft or more then a modular is not appropriate. USE a PT design


Project Engineer Signature
Date

NOTES:

To Complete Form Submission, Please Click 'Complete Form' Below